IntelliPaper
Abstract
Cost overruns have provided a significant challenge in the construction industries of both developed and developing countries. Financial and Contract Management incorporate designs and approaches which take keen interest on issues associated to Contract Financing which informed the basis of investigation of the concept of Construction Cost Overruns in Real Estate Projects in this study. The purpose of this study was to investigate the influence Contract Financing on Construction Cost Overruns of real estate projects in Nairobi and Kisumu Counties. The study was guided by objectives to establish the extent to which Contract Financing influence construction cost overruns in real estate projects. The study was based on pragmatic paradigm which provides for the use of both qualitative and quantitative research methodologies. The research adopted descriptive survey and correlational research designs. The study targeted a population of 4000 project professionals that are 7 from active real estates in Nairobi and Kisumu Counties and 10 key informants from the real estate industry. Using the Krejcie and Morgan table of sampling method, the sample size for this study was 351. The study then adopted stratified, simple random and purposive sampling methods to select appropriate sample sizes from the study population. Structured questionnaire was the main instrument for data collection, supported by interview guide. Hypothesis tested at α=0.05 level of significance and the results were: .H0: There is no significant relationship between Contract Financing and Construction Cost Overruns in real estate projects was rejected since P=0.000
Explore Digital Article Text
Full-text access for this article is currently being prepared and will be available shortly.
Conflict of Interest
The authors declare no conflict of interest.
Ethical Approval
Not applicable
Data Availability
The datasets used in this study are openly available at [repository link] and the source code is available on GitHub at [GitHub link].
Funding
This work did not receive any external funding.
Cite this article
Special Issue
Launch a focused special issue to highlight research, emerging trends, and expert insights in your academic field.